Close

CONTACT

Podgaj 14, Sarajevo 71000,

Bosnia and Herzegovina

+387 33 279-100

info@enova.ba

Feasibility study for construction of the waste water treatment plant (WWTP) for the leachate water from the Regional sanitary landfill “Mošćanica”

The objective of the project was the development of the feasibility study and the conceptual design for construction of the waste water treatment plant (WWTP) for the leachate water from the Regional sanitary landfill “Mošćanica” in Zenica. The feasibility study includes an analysis of alternative technological solutions, as well as possibilities for the discharge of wastewater to public sewage system collectors.